ADU Construction in Payette, Idaho
Iron Crest Remodel provides expert adu construction services to homeowners in Payette and surrounding Payette County communities. Accessory dwelling units and backyard cottages in Boise.
Looking for professional adu construction in Payette, Idaho? Iron Crest Remodel serves Payette homeowners with the same quality, warranties, and professionalism we bring to every Treasure Valley project. Located ~59 miles from HQ, Payette is within our core service area with quick response times.

- Custom ADU design (studio to 2-bedroom)
- Full kitchen and bathroom builds
- Independent utility connections
- Zoning and permit management
- Foundation and framing
- Insulation and HVAC systems
- Interior and exterior finishes
- Landscaping and site restoration
- ADA-accessible ADU options
- Garage conversion to ADU
Timeline
4 – 8 months
Feasibility Assessment
We evaluate your property for ADU eligibility — lot size, setbacks, zoning, utility access, and site conditions. You receive a feasibility report with size and placement options.
Design & Permitting
Architectural plans are developed, engineered, and submitted for building permits. We coordinate with the City of Boise and Ada County for all required approvals.
Site Work & Construction
Foundation, framing, roofing, siding, windows, and doors are completed. Plumbing, electrical, and HVAC are installed. Interior finishes follow.
Final Inspections & Occupancy
All required inspections are completed, certificate of occupancy is obtained, and the ADU is ready for use — whether for family, guests, or rental income.
Can I build an ADU on my property in Boise?
Boise adopted updated ADU regulations that allow accessory dwelling units on most residential lots. Requirements include minimum lot size, setback distances, and maximum ADU size limits. Iron Crest Remodel evaluates your property eligibility during the initial consultation.
How much does an ADU cost to build in Boise?
ADU construction in Boise typically costs $150,000-$300,000 depending on size, finishes, and site conditions. A basic 400 sq ft studio ADU starts around $120,000. A full 800 sq ft one-bedroom unit with premium finishes can reach $250,000+.
How long does it take to build an ADU?
From permit approval to completion, ADU construction takes 4-8 months. The permitting process itself can take 4-12 weeks depending on the jurisdiction and complexity.
Not every adu construction project is the same. Cosmetic updates are minor refreshes — not full remodels. Full remodels start at the Standard tier and above. Here are the most common scope levels we handle in the Boise area, with typical investment ranges.
Garage Conversion
$80,000 – $150,000
Convert an existing attached or detached garage into a living unit. Lower cost because the shell exists. Plumbing, electrical, insulation, and finishes required.
Studio ADU (400–500 sq ft)
$120,000 – $200,000
Compact open-plan unit with kitchenette, bathroom, and combined living/sleeping area. Most affordable new-build option.
One-Bedroom ADU (500–800 sq ft)
$180,000 – $280,000
Separate bedroom, full kitchen, bathroom, and living area. Most popular size for Boise rental ADUs.
Two-Bedroom ADU (800–1,000 sq ft)
$250,000 – $350,000+
Full-size dwelling with two bedrooms, full kitchen and bath, and dedicated living space. Maximum rental income potential.
Remodeling in the Treasure Valley comes with local factors that affect scope, cost, and timeline. Here is what Boise-area homeowners should know.
Boise ADU Zoning
Boise allows ADUs on most R-1 residential lots. Maximum size is typically 10% of lot area or 900 sq ft, whichever is less. ADUs must maintain primary dwelling setbacks and can be detached or attached.
Utility Connections
New ADUs require separate water, sewer, and electrical connections. Boise City water/sewer connection fees run $8,000–$15,000. Electrical service panel and meter add $3,000–$6,000.
Rental Market
Boise ADU rental rates average $1,200–$1,800/month for studios and $1,500–$2,200/month for one-bedrooms (2024 market data). Strong rental demand from Boise State students, young professionals, and remote workers.
Fire Separation
Detached ADUs within 5 feet of the primary dwelling or property line require one-hour fire-rated construction. This affects wall assembly, sheathing, and siding choices.
Choosing between detached adu (new build) and garage conversion? Here is a side-by-side comparison to help you decide.
| Factor | Detached ADU (New Build) | Garage Conversion |
|---|---|---|
| Cost | $180,000–$350,000 | $80,000–$150,000 |
| Timeline | 5–8 months | 3–5 months |
| Privacy | Fully separate structure | Adjacent to main home |
| Parking Impact | No garage lost | Lose garage parking |
| Design Freedom | Unlimited layout options | Constrained by existing shell |
Plan your adu construction project with our in-depth guides.
Explore our in-depth guides to understand adu construction costs, timelines, and planning details for cities across the Treasure Valley.
Ready to Start Your Remodeling Project?
Get a free, no-obligation estimate from Boise's trusted remodeling experts. Licensed, insured, and ready to build.
Iron Crest Remodel brings adu construction expertise directly to Payette, ID. Located ~59 miles from HQ, Payette is within our core service area — close enough for quick site visits, material deliveries, and responsive project management.
ADU Construction costs in Payette depend on project scope, materials selected, and site conditions. The ranges below reflect our experience across Payette County and the broader Treasure Valley market. Every Iron Crest proposal includes a detailed, line-item breakdown — no vague allowances or hidden fees.
| Detail | Estimate |
|---|---|
| Typical Cost Range | $120,000 – $300,000+ |
| Typical Timeline | 4 – 8 months |
| Free Estimate | Yes — in-home consultation, no obligation |
| Pricing Model | Fixed-price proposal with line-item detail |
Contact us for a free, project-specific estimate for your Payette home.Request your free estimate →
Research your adu construction project with our in-depth Boise-area guides covering costs, timelines, materials, design ideas, and permit requirements.
We provide adu construction services throughout Payette, including these neighborhoods and surrounding areas.
As the county seat of Payette County, Payette has some of the oldest housing stock in the region. Downtown features homes from the late 1800s and early 1900s — wood-framed structures with plaster walls, knob-and-tube wiring, galvanized plumbing, and lead paint in pre-1978 construction. These homes require careful renovation planning including lead paint testing, complete electrical rewiring, and plumbing replacement. The 1960s–1980s ranch neighborhoods north and south of downtown offer single-story homes with dated kitchens and small bathrooms that are prime candidates for modernization. Newer construction on the outskirts features builder-grade finishes. Payette sits at the confluence of the Payette and Snake rivers, which means some properties face seasonal moisture concerns and drainage considerations affecting foundation work and bathroom waterproofing.
“Our 1940s Payette home needed a complete kitchen overhaul — the wiring was ancient, the plumbing was galvanized, and the cabinets were falling apart. Iron Crest rewired the kitchen, replaced all the plumbing, installed gorgeous new cabinets and quartz counters, and handled the Payette County permits. The transformation is incredible.”
— Robert & Karen J., Downtown Payette | Kitchen Remodeling
“We had a tiny, outdated bathroom with a cracked tub surround and no ventilation fan. Iron Crest converted it to a walk-in shower with grab bars for my mother, installed a proper exhaust fan, and replaced the vanity and flooring. They were respectful of our older home and finished in two weeks.”
— Angela M., South Payette | Bathroom Remodeling
“Iron Crest remodeled our kitchen and hall bathroom as a package deal. They handled the lead paint testing on our 1960s ranch, managed all the permits, and the finished product looks amazing. Best contractor experience we've had in Payette — honest, on time, and on budget.”
— Tom & Diane P., North Payette | Kitchen & Bathroom Remodeling
- Kitchen and bathroom remodels involving plumbing, electrical, or structural changes require a Payette County building permit
- Permit fees typically range from $75–$250 depending on project scope — significantly lower than Ada County rates
- Homes built before 1978 may require lead paint testing before renovation work can begin
- Plan review turnaround is usually 1–2 weeks, faster than Boise metro jurisdictions
- Iron Crest Remodel handles all permit applications, plan submissions, and inspection scheduling as part of our fixed-price contracts
Iron Crest Remodel handles all permit applications, plan submissions, and inspection scheduling for your adu construction project in Payette. Permit requirements and fees are included in our fixed-price proposals.
Ready to start your adu construction project in Payette? Here are the next steps to get your project moving.
Other Service Areas
Start Your Payette ADU Construction Project
Get a free, no-obligation estimate for adu construction in Payette, Idaho. Licensed, insured, and ready to build.
