
Hall Bathroom Renovation in Star
A complete hall bathroom renovation — replacing a dated tub/shower combo, vanity, and flooring with a modern tub/shower unit, floating vanity, and large-format floor tile in this busy family bathroom.
Project Details
- Project Duration
- 3.5 weeks
- Square Footage
- 55 sq ft
- Budget Range
- $18,000–$24,000
- Tub Type
- Cast iron (Kohler)
- Vanity Style
- Wall-mounted floating
- Year Built
- 2017
The hall bathroom served three kids and was showing every bit of it. The original fiberglass tub/shower insert had permanent staining, the single-sink vanity had swollen particleboard from years of water splashes, the vinyl floor was peeling, and the exhaust fan barely moved air. The homeowners wanted a durable, kid-proof bathroom that still looked stylish — one that could handle the daily abuse of a family of five without showing wear in two years.
We gutted the bathroom to studs and replaced everything. A new Kohler Bellwether cast iron tub was installed with a tile surround using large-format 12×24 porcelain — far more durable and cleanable than fiberglass. A wall-mounted floating vanity with a solid-surface top keeps the floor clear for easy mopping and eliminates the particleboard swelling issue. Porcelain floor tile with textured anti-slip finish replaced the vinyl. A Panasonic WhisperGreen exhaust fan with humidity sensor was installed to prevent moisture buildup automatically. All plumbing supply lines were replaced with PEX.
The bathroom has handled a full year of three kids using it daily and still looks brand new. The cast iron tub is virtually indestructible, the floating vanity makes floor cleaning effortless, and the humidity-sensing fan eliminates the steamy mirror problem they used to deal with after every shower. The homeowners say the space feels bigger because of the floating vanity and consistent large-format tile.

Finished hall bathroom with floating vanity and tile surround

Wall-mounted floating vanity with solid-surface top

Large-format porcelain tile on floor and tub surround
Design & Selection
1 weekLayout confirmation, fixture selection, tile and vanity choices, material ordering
Demolition
1 dayComplete gut: tub, vanity, flooring, drywall removal to studs
Plumbing & Electrical
2 daysPEX supply line replacement, drain work for new tub, fan wiring, vanity blocking
Waterproofing & Tile
1 weekCement board, Kerdi membrane at tub surround, floor tile, tub surround tile
Vanity, Fixtures & Finish
4 daysFloating vanity mount, tub installation, fixtures, mirror, fan, accessories, paint
Final Walkthrough
1 dayGrouting, caulking, touch-ups, cleaning, homeowner walkthrough
“Three kids have been using this bathroom for a year now and it still looks perfect. The floating vanity was genius — no more water damage underneath. And the fan turns itself on. We should have done this years ago.”
The Rawlings Family
Star

Kitchen Remodeling
North End, Boise
A 1960s galley kitchen transformed into an open-concept modern kitchen with custom shaker cabinetry, quartz countertops, and a 9-foot island — redesigned for how the family actually uses the space.
View Project
Bathroom Remodeling
Paramount Subdivision, Meridian
A dated 2004 builder-grade master bathroom converted into a spa-inspired retreat with a curbless walk-in shower, heated tile floors, and custom double vanity.
View Project
Whole-Home Remodeling
Southeast Boise, Boise
A comprehensive renovation of a 1,800 sq ft ranch home — two bathrooms, kitchen refresh, new flooring throughout, interior paint, updated trim, and modern lighting in every room.
View ProjectPlanning a bathroom remodeling project?
Get a free, no-obligation estimate for your project in Star or anywhere in the Treasure Valley.