
From tub-to-shower conversions to luxury walk-in designs with frameless glass, rain showerheads, and built-in niches — we handle every detail from waterproofing to finish hardware.
Meridian's homeowners are upgrading their builder-grade bathrooms at an accelerating rate, and the shower is consistently the highest-impact project in the renovation budget. The fiberglass modules and acrylic tub surrounds installed in Meridian's production homes from the 1990s through the 2000s were functional on move-in day — they are not functional, attractive, or structurally sound 20 years later. Crazed surfaces, cracked bases, failed caulk, and the unmistakable yellowing of aged polypropylene are the telltale signs of a shower system that has reached end of life. Iron Crest Remodel brings Schluter Systems waterproofing, large-format tile expertise, and frameless glass fabrication to Meridian shower remodels — delivering spa-quality custom showers that transform the daily experience of the bathroom while protecting the home's structure from the moisture damage that deteriorating original showers allow.
Design and build the shower you have always wanted — from custom tile work to barrier-free walk-ins.

A shower remodel transforms one of the most-used spaces in your home — from a basic, builder-grade enclosure into a custom-designed space that fits your daily routine, aesthetic preferences, and long-term needs. Shower remodeling involves demolition of the existing shower or tub, plumbing rough-in for new drain and supply locations, structural preparation, waterproofing membrane installation, tile or panel application, glass enclosure installation, and fixture mounting. In the Treasure Valley, many homes built in the 1990s and 2000s have small, dark, builder-grade showers with fiberglass surrounds, poor drainage, and inadequate waterproofing that leads to hidden water damage over time. A properly planned shower remodel addresses all of these issues while creating a space that is both beautiful and built to last. The most critical element of any shower build is waterproofing — every surface that receives water must be properly membraned, sealed, and sloped to prevent moisture from reaching the framing and subfloor behind the finished surface.
Meridian homeowners pursue shower remodeling for a variety of reasons. Here are the most common situations we see:
Not every shower remodel project is the same. Here are the most common project types we complete in Meridian:

Remove an existing bathtub and replace it with a custom walk-in shower. Includes new drain placement, curb or zero-threshold entry construction, waterproofing, tile installation, glass enclosure, and updated fixtures.

Redesign and rebuild an existing shower with new tile, fixtures, glass enclosure, niches, and lighting. May include expanding the shower footprint, adding a bench, or changing the layout.

Design and build a zero-threshold shower with curbless entry, linear drain, anti-slip tile flooring, grab bars, fold-down bench seating, and handheld showerhead for accessible daily use.

High-end shower build with premium tile, rain showerhead, body sprays, thermostatic valve system, LED lighting, large-format niches, and frameless glass enclosure. Designed for a spa-like daily experience.

Install grout-free solid surface shower panels for a clean, low-maintenance alternative to tile. Ideal for homeowners who want a fresh shower without the upkeep of grout cleaning and sealing.

Meridian's housing stock is predominantly post-1990 construction. The majority of homes feature PEX plumbing, 200-amp electrical panels, and energy-efficient windows — but with builder-grade interior finishes that homeowners upgrade as the homes age.
Early subdivision homes with standard 90s finishes: oak cabinets, laminate countertops, carpet throughout, and basic tile in bathrooms. These homes are 25-35 years old and are the most common full-remodel candidates.
Larger homes with better floor plans but still builder-grade finishes. Many have slab granite installed during the granite boom but are now dated. Cabinets, fixtures, and flooring are the primary upgrade targets.
Newer construction with open floor plans and modern systems. Homeowners typically upgrade finishes 3-7 years after purchase — replacing builder-grade countertops, cabinet hardware, lighting, and flooring.

Material selection affects the look, durability, and cost of your shower remodel. Here are the most popular options we install in Meridian:

The most popular shower surface material. Dense, water-resistant, available in hundreds of styles including large-format, wood-look, stone-look, and mosaic options. Large-format tiles (12x24 and up) create a modern, seamless look.
Best for: Shower walls, floors, niches, and accent features

Premium tile option that delivers a luxurious, one-of-a-kind look. Marble hexagon floors, marble slab walls, and travertine accents create a spa-like atmosphere. Requires sealing and careful maintenance.
Best for: Feature walls, luxury shower floors, accent strips, and niche interiors

Bonded waterproofing membrane system applied to every shower surface. Available as sheet membrane, liquid-applied membrane, or foam board panels. The single most critical material in any shower build — it prevents water from reaching the structure.
Best for: Every shower floor, wall, curb, niche, and bench surface — no exceptions

Custom-measured and fabricated clear tempered glass panels and door with minimal hardware for a clean, modern look. Available in 3/8-inch and 1/2-inch glass thicknesses with various hardware finishes.
Best for: Walk-in showers where visual openness and modern design are priorities

Pressure-balancing or thermostatic shower valve with trim, showerhead, and optional handheld sprayer. Quality fixtures from Moen, Delta, Kohler, or Grohe provide reliable temperature control and water delivery.
Best for: Every shower — the valve is the functional heart of the shower system

Here is how a typical shower remodel project works from first contact to final walkthrough:
We visit your bathroom, evaluate the existing shower or tub space, discuss your daily routine and wish list, and review layout options, material choices, and fixture selections. You receive a design concept and detailed estimate.
We finalize the shower layout, tile design, niche locations, fixture selections, glass enclosure style, and any accessibility features. Materials are ordered and lead times are confirmed. A fixed-price contract is prepared.
The existing shower or tub is demolished, and we inspect the framing, subfloor, and drain condition. New plumbing rough-in is completed for the reconfigured drain location, supply lines, and valve placement. Framing modifications for niches, benches, and shower size are completed.
This is the most critical phase. We apply a bonded waterproofing membrane system (Schluter Kerdi, Laticrete Hydro Ban, or equivalent) to every shower surface — floor, walls, curb, niches, and bench. The shower pan is sloped to the drain and tested for leak-proof integrity before tile begins.
Floor tile is installed first with proper slope to drain, followed by wall tile, niche tile, bench tile, and any accent or feature tile. Grout is applied, cleaned, and sealed. Large-format tiles, mosaics, and accent patterns are laid out precisely per the design plan.
The glass enclosure (frameless, semi-frameless, or framed) is measured, fabricated, and installed. Showerhead, valve trim, diverter, handheld sprayer, grab bars, towel hooks, and all hardware are mounted and tested.
We run the shower for an extended test to verify drainage, water pressure, valve operation, and leak-free performance. Grout sealant is applied, and a final walkthrough ensures every detail meets expectations.
Here is what to expect for project duration when planning a shower remodel in Meridian:
| Phase | Duration | Details |
|---|---|---|
| Design and Material Selection | 1–3 weeks | Consultation, design development, tile and fixture selection, and contract finalization. Material lead times for specialty tile and glass can add 2-4 weeks. |
| Demolition and Plumbing Rough-In | 2–3 days | Remove existing shower or tub, inspect framing and subfloor, complete plumbing rough-in for new drain and supply locations, and frame any niches or benches. |
| Waterproofing | 1–2 days | Apply waterproofing membrane to all shower surfaces. Test the shower pan for leak-proof performance. This phase must be completed and verified before tile begins. |
| Tile Installation | 3–6 days | Floor tile, wall tile, niche tile, and accent tile installation. Grouting and sealing. This is typically the longest phase of active construction. Complex designs take longer. |
| Glass and Fixture Installation | 1–2 days | Glass enclosure measurement, fabrication (if not pre-ordered), and installation. Showerhead, valve trim, hardware, and accessories are mounted and connected. |
| Final Testing and Walkthrough | 1 day | Extended shower test, drainage verification, grout sealing, and homeowner walkthrough to confirm quality and function. |
Meridian range: $8,000 – $32,000
Most Meridian projects: $16,000
Meridian shower remodel costs track closely with Boise's market, reflecting shared Ada County labor costs, similar material supply chains, and comparable housing typology. A basic tub-to-walk-in-shower conversion — fiberglass module removal, substrate remediation, Schluter KERDI waterproofing, 12x24 porcelain tile walls, pre-sloped mortar bed floor, semi-frameless glass enclosure, and basic plumbing modifications — runs $8,000 to $13,000. A mid-range project with large-format 24x24 or 24x48 tile, built-in niche, frameless glass enclosure, and quality fixtures runs $13,000 to $20,000. Full bathroom gut remodels in Meridian primary suites — where the shower remodel is combined with new vanity, flooring, and lighting — range from $22,000 to $40,000+. Substrate remediation discovered during demolition is quoted separately and is a genuine contingency item in Meridian's production homes: expect $1,500 to $3,500 for subfloor repair and framing remediation in projects where the original module showed any base cracking or drain fitting issues.
The final cost of your shower remodel in Meridian depends on several factors. Here are the biggest cost drivers:
A standard 3x4 foot shower costs significantly less than a 4x6 or 5x8 foot walk-in. Larger showers require more tile, more waterproofing, larger glass enclosures, and more labor.
Standard subway tile on walls with mosaic floor tile is the most affordable option. Large-format tiles, natural stone, intricate mosaic patterns, accent bands, and niche detailing increase material and labor costs significantly.
Keeping the drain and supply lines in their existing locations is the most affordable approach. Moving the drain, adding supply lines for multiple showerheads, or converting from a tub configuration adds plumbing labor and material cost.
A shower curtain is the least expensive enclosure. Semi-frameless glass doors run $800-1,500. Frameless glass enclosures with custom panels range from $1,200-3,500+ depending on size and configuration.
Zero-threshold entries with linear drains, built-in bench seating, grab bar blocking, and anti-slip flooring add cost but provide essential function for aging-in-place planning.
Builder-grade showerheads and valves start around $150-300. Mid-range fixtures from Delta, Moen, or Kohler run $400-800. Premium thermostatic systems with rain heads and body sprays can exceed $2,000.
These are the real-world projects we see most often from Meridian homeowners:
The highest-volume shower project Iron Crest executes in Meridian is the conversion of a primary suite fiberglass module to a custom walk-in shower in a home built between 1998 and 2008. The scope is consistent across dozens of similar projects: remove the original module and assess subfloor and framing; install new cement board substrate with Schluter KERDI waterproofing membrane to all walls and the shower floor; install a pre-sloped foam shower floor system sloped to a 4-inch center drain; tile walls with 12x24 porcelain in a current mid-tone neutral; tile the shower floor with a 4x4 or 2x4 mosaic floor tile; install a single built-in niche; plumb a new thermostatic shower valve with ceiling-mounted rain showerhead and hand shower; and install a 3/8-inch tempered glass frameless enclosure fabricated to the actual opening dimensions after tile is complete. The result transforms the bathroom's primary visual element from a yellowing plastic module to a custom spa-quality shower in 8 to 12 business days.
A North Meridian homeowner in a 2006 two-story wants a premium result: 24x48 large-format porcelain on the shower walls in a stone-look veined pattern, a linear drain with a tile-insert cover that maintains a continuous floor plane, built-in bench with a coordinating tile surface, and a full-height frameless glass enclosure with pivot hardware. This project requires the technical depth that large-format tile demands: substrate preparation to ANSI A108.02 flatness tolerances, back-buttering each tile to achieve minimum 95 percent mortar coverage, and lippage control at every joint to meet the visual standard this format requires. The linear drain floor installation requires a precisely sloped foam system fabricated to a single-plane slope (as opposed to the four-way slope of a center drain installation) to prevent lippage variation across the large-format floor tiles. Schluter KERDI waterproofing is applied under all surfaces including the bench and niche. The finished project reads as a premium custom shower indistinguishable from high-end new construction.
A Paramount homeowner has a secondary bathroom — the hall bath shared by two kids — with an original tile tub surround that is showing grout deterioration, failed caulk at the tub perimeter, and a growing mold problem at the tile-to-tub junction. Rather than a tub removal (the family has young children who use the tub), the scope is a complete re-tile of the shower surround: demolition of existing tile back to the studs, waterproofing with Schluter KERDI on all three walls, installation of 4x12 subway tile in a clean white with a standard running bond pattern, new backer rod and neutral caulk at the tub perimeter, and a semi-frameless glass door on the shower end. The original tub is retained after professional refinishing. The result is a bathroom that looks completely updated and is properly waterproofed for the next 15 to 20 years of family use.
A Lochsa Falls homeowner undertaking a full primary bathroom remodel — new vanity, flooring, and shower — wants a steam shower in the new custom shower enclosure. The steam system adds specific requirements to the design: a fully enclosed shower with no gaps in the glass enclosure, a sloped ceiling above the shower area to direct condensate away from bathers, a dedicated 240V circuit for the steam generator (mounted in the vanity cabinet), a water supply and condensate drain connection, and a steam-specific control valve with digital interface. The tile selection is a book-matched 24x48 stone-look porcelain with matching trim pieces at horizontal transitions. All surfaces including the steam generator alcove and the sloped ceiling are waterproofed with KERDI. The frameless glass enclosure is fabricated in a fully enclosed configuration with a precision-fit door seal. This project requires coordination across tile installer, plumber, electrician, and glass fabricator — which is the general contractor's responsibility to manage as a unified scope.
Some Meridian homeowners have a structurally failing shower floor — a cracked base, soft subfloor under the drain area, or a misaligned drain fitting — but relatively intact shower walls that they prefer not to disturb. A standalone shower floor replacement addresses the structural failure without requiring a full shower demolition: the existing floor tile is carefully removed, the subfloor is repaired or replaced, a new pre-sloped mortar bed or foam shower floor system is installed over Schluter KERDI, and matching (or complementary) floor tile is installed. The plumber re-seats the drain fitting in a proper flange with a compression gasket sealing the pipe-to-drain interface. This targeted scope is the right approach when the walls are in sound condition and the homeowner wants to address the structural problem at minimum cost.

Solution: We demolish to studs, inspect and repair all water-damaged framing and subfloor, and rebuild with a proper waterproofing membrane system that prevents future moisture intrusion.
Solution: We expand the shower footprint where possible, use light-colored large-format tile to open up the space, install a frameless glass enclosure for visual openness, and add recessed LED lighting for a bright, spacious feel.
Solution: We remove the old surround, inspect the substrate, install proper waterproofing, and build a custom tile shower that transforms both the look and feel of the space.
Solution: We evaluate your water supply capacity and install a pressure-balancing or thermostatic valve system with options for rain showerheads, handheld sprayers, and body jets — significantly improving the shower experience.
Solution: We use mold-resistant grout, properly sealed tile joints, and premium silicone caulk at all change-of-plane transitions. A properly waterproofed shower with adequate ventilation prevents mold from developing behind the finished surface.

Meridian shares Boise's semi-arid climate with hot summers, cold winters, and low humidity. The same material and construction considerations apply — UV resistance for exterior materials, freeze-thaw durability, and proper insulation.
Exterior materials and finishes must resist UV degradation. West-facing windows and walls get the most sun exposure. Proper insulation and HVAC sizing are critical for comfort.
Frost depth requirements affect foundation work for additions and ADUs. Plumbing in exterior walls and crawl spaces needs freeze protection.
Meridian's open terrain means more wind and dust exposure than central Boise. Exterior finish quality and window sealing matter for long-term durability.
Less rain means less exterior moisture exposure, which is favorable for siding and paint longevity. However, irrigation and ground moisture around foundations still require attention.
The largest and fastest-growing area, with subdivisions built from 2005 to present. Homes range from 1,500 to 3,500+ square feet with builder-grade finishes that homeowners customize over time.
Common projects in South Meridian:
Established neighborhoods with homes from the 1990s and early 2000s. These homes are 20-30+ years old and ready for comprehensive updates.
Common projects in North Meridian:
Mid-to-upper market subdivisions with larger homes (2,500-4,000+ sq ft). Homeowners here often pursue higher-end finishes and design-focused remodels.
Common projects in Paramount / Lochsa Falls:
Every Meridian neighborhood has different housing stock, homeowner priorities, and project considerations. Here is what shower remodel looks like in each area:
Permit authority: City of Meridian Building Department
Online portal: https://meridiancity.org/building
Here are the design trends we see most often in Meridian shower remodel projects:
Meridian's real estate market has grown dramatically, with median home values rising alongside Boise's. The city's family-friendly reputation and strong school district make it one of the most desirable markets in Idaho. Homeowners who remodel in Meridian see strong returns — updated kitchens and bathrooms are the top features buyers look for in this market.

Avoid these common pitfalls Meridian homeowners encounter with shower remodel projects:
Better approach: Tile-over-module installations are sometimes offered by budget contractors as a way to reduce labor cost, but they are fundamentally flawed for two reasons. First, the weight of a full tile installation over an existing fiberglass module exceeds what the module and its adhesive support system were designed to carry — the additional weight causes the module to flex under foot traffic, and tile bonded to a flexing substrate cracks at grout joints within one to two years. Second, the underlying structural issues that motivated the renovation — the failed seals, cracked base sections, and moisture damage under the module — remain unaddressed and continue to deteriorate behind the new tile. Iron Crest will not execute tile-over-module installations. The right process is demolition to the studs, inspection and remediation of any substrate damage discovered, and a fresh installation built on a proper waterproofed substrate.
Better approach: Large-format tile — 24x24, 24x48, and larger — requires substrate preparation and installation technique that is genuinely beyond the capability of installers who primarily work with smaller formats. The flatness tolerances required (1/8-inch maximum variation over 10 feet), the lippage control required at every joint, and the back-buttering technique required for full mortar coverage are skills developed through repetition with large formats specifically. A homeowner who selects 24x48 tile and hires an installer whose experience is in 4x12 subway tile is likely to get an installation that looks fine in normal daylight but shows noticeable lippage under raking light or when running a hand across the surface. Ask specifically about large-format tile installation experience when selecting a contractor, and ask to see examples of completed large-format projects before committing.
Better approach: Every Meridian shower remodel involving an original fiberglass module should include a contingency budget for subfloor and framing remediation discovered during demolition. The rate at which this work is needed in Meridian's production homes — where OSB subfloor, aging module seals, and 15 to 25 years of moisture exposure combine — is high enough that treating it as a surprise rather than a planned contingency leads to frustrated homeowners and strained contractor relationships. Iron Crest communicates a specific contingency range ($1,500 to $3,500 for most South and North Meridian homes) in every shower remodel proposal and explains the discovery conditions that trigger it. Homeowners who budget this contingency from the outset are consistently more satisfied with the overall project experience.
Better approach: Schluter KERDI membrane, when embedded in unmodified thinset, requires 24 to 48 hours of cure time before tile can be set over it — and tile set over KERDI must in turn cure for 24 hours before grout can be applied. Rushing the tile installation or grouting before adequate cure time allows the setting materials under and over the membrane to move during the curing process, creating micro-voids in the mortar bed that compromise tile bond and can allow the membrane to shift. In Meridian's production home market, where project schedules are sometimes compressed by homeowner eagerness to complete the project, maintaining the proper cure time sequence is a non-negotiable professional standard. Iron Crest's shower installation process is scheduled with the cure time requirements of each material layer built into the day-by-day schedule.
Better approach: Frameless glass enclosures must be custom fabricated to the exact dimensions of the finished shower opening — the opening size after tile installation is not the same as the rough opening size, and the difference can be significant depending on tile thickness and setting material depth. Glass ordered before tile installation is complete, based on estimated finished dimensions, frequently requires field adjustments that the glass shop charges for as additional fabrication or that result in panels that fit imprecisely. Iron Crest's standard process is to template the shower opening after tile installation and grouting are complete, submit the templated dimensions to the glass fabricator for precision cutting, and schedule installation after the glass is fabricated to the actual opening — a sequence that takes 1 to 2 additional weeks but produces a glass installation that fits without shimming, adjustment, or compromise.
A typical Meridian shower conversion — removing an original fiberglass module and installing a custom tile shower — takes 8 to 12 business days from demolition to final glass installation. During this time, the bathroom being remodeled is out of service. If your home has more than one full bathroom, the project is simply a scheduling inconvenience — you use the other bathroom during construction. If the home has only one shower, Iron Crest typically schedules work to complete the waterproofing and shower floor installation on days 3 to 4, allowing the tile crew to begin wall tile by day 5. The shower is not functional until glass installation is complete and grout has cured — typically on business day 9 to 11. For single-shower homes, many clients schedule a short stay elsewhere or use a gym membership for the core construction period. We communicate the day-by-day project schedule before work begins so homeowners can plan accordingly.
Cement board (HardieBacker, Durock) provides a stable, dimensionally consistent substrate for tile but is not itself waterproof — it is moisture resistant, meaning it does not disintegrate when wet, but water passes through it freely. A shower tiled over cement board without a waterproofing membrane relies on the tile and grout to manage all water — and grout is not waterproof. As grout joints micro-crack over years of thermal cycling and cleaning, water migrates through the grout into the cement board and beyond into the framing. Schluter KERDI, applied between the cement board and the tile, creates a true waterproof membrane that stops water migration at that layer. The cost premium for KERDI over cement board alone is approximately $400 to $600 for a typical shower — a fraction of the cost of the framing and subfloor remediation that waterproofing failures require. Iron Crest uses KERDI on every shower project as a non-negotiable standard. We have seen too many Meridian shower demolitions with extensive framing damage behind cement-board-only installations to accept any waterproofing approach less robust than a membrane system.
Yes, absolutely. Not every Meridian homeowner wants to convert to a walk-in shower — families with young children need a bathtub for functional reasons, and some homeowners prefer to retain the bathtub for their own use. If you want to keep the existing tub and update the tile surround, Iron Crest removes the existing tile (not the tub) back to the studs, inspects and addresses any substrate damage discovered, installs Schluter KERDI waterproofing on all three surround walls, and re-tiles with your selected tile. The critical detail on a tub surround re-tile is the tile-to-tub interface: instead of caulk applied over old caulk (the cycle that fails every 2 to 5 years), we install the tile to within 1/8 inch of the tub rim and fill the gap with a high-quality silicone caulk in a matching color. This joint accommodates the thermal movement of the tub without failing the way grouted or over-caulked interfaces do. The tub itself may be refinished by a tub refinishing specialist if its surface has aged — Iron Crest can coordinate this service.
Fogging between shower enclosure glass panels is caused by soap scum, hard water mineral deposits, or cleaning product residue on the glass surface — not between panes, as with a failed window IGU. Shower glass is single-pane tempered glass, not a double-pane assembly, so there's no possibility of the inter-pane fogging that affects windows. The surface fogging on shower glass is a maintenance issue rather than a structural failure: the glass surface has accumulated a film that routine cleaning has not removed. A dedicated hard water stain remover (CLR, Bar Keepers Friend) applied with a non-abrasive pad, followed by a squeegee after each shower use and periodic application of a water repellent product (Rain-X) will manage the problem. If the glass is pitted from years of hard water deposits and etched by cleaning products, polishing with a cerium oxide glass polishing compound can restore clarity. If the glass is cracked, chipped, or the hardware is failing, replacement is the appropriate solution — not for fogging reasons, but for structural integrity of the enclosure.
The determination requires a physical inspection that goes beyond what's visible from the surface. Surface indications that the shower floor may need structural replacement: soft, spongy feeling when you step near the drain or near the curb; visible deflection of the floor tile when you stand on it; a cracked floor tile that returns after being replaced; or an elevated shower floor that bounces. These symptoms suggest that the subfloor beneath the tile system has been compromised by moisture — typically delaminated OSB in Meridian's production homes. The only way to confirm subfloor condition is demolition: removing the existing floor tile exposes the setting material and subfloor beneath. If the subfloor is wet, soft, or delaminating, replacement is required before any new tile can be installed. If the subfloor is dry and structurally sound, the tile system can be rebuilt over the existing subfloor with new waterproofing and setting material. Iron Crest includes a subfloor condition inspection and written report as part of every shower remodel proposal process.
A shower remodel in the Boise area typically costs $6,000-12,000 for a standard tub-to-shower conversion with tile, $10,000-18,000 for a mid-range custom walk-in shower, and $18,000-30,000+ for a luxury shower with premium tile, frameless glass, and multi-head fixtures.
A typical shower remodel takes 2-3 weeks from demolition to completion. Simple tub-to-shower conversions with panel systems can be faster. Complex custom tile showers with specialty glass take longer. Design and material ordering before construction adds 2-4 weeks.
Walk-in showers are preferred for daily use, accessibility, and modern design. However, having at least one bathtub in the home is recommended for families with young children and for resale value. Many homeowners convert a secondary tub to a shower while keeping one tub elsewhere.
Waterproofing. Every square inch of the shower — floor, walls, curb, niches, and bench — must be properly membraned to prevent water from reaching the framing and subfloor. Proper waterproofing prevents leaks, mold, rot, and structural damage that are extremely costly to repair.
Absolutely. Modern accessible shower design uses curbless entries with linear drains, decorative grab bars in matching finishes, teak fold-down benches, and the same premium tile and glass as any custom shower. The result is a beautiful shower that happens to be accessible.
Small mosaic tiles (2x2 or penny rounds) are the traditional choice because they conform to the shower pan slope and provide grip with many grout lines. Large-format tiles with linear drains are increasingly popular for a modern, seamless look but require precise slope and installation.
Yes. We coordinate all plumbing work through licensed plumbers. This includes drain relocation, supply line modifications, valve installation, and fixture connections. All plumbing work is permitted and inspected per local code requirements.
Get a free, no-obligation estimate for shower remodeling in Meridian, ID. We handle design, permits, and every detail of construction.
Get Your Free Estimate