Deck Replacement in Boise — Iron Crest Remodel

Deck Replacement in Boise

New boards on a sound frame, a new frame on sound posts, or a full tear-out to new footings. What is under the old boards decides which one you need — so we look there first.

Reviewed by George Shvaya, Builder & RemodelerLast reviewed

Quick answer

Iron Crest replaces decks at three scopes: new boards and railing on a frame that is still sound, a new frame on existing posts and footings that are still sound, or a full tear-out to new footings. The scope is set by what is under the boards — the ledger and its flashing, the post bases and the footings — so we inspect from below before we price it.

Three replacement scopes we build

“Deck replacement” covers three quite different jobs. The difference is how much of the old structure stays — and that is decided by inspection, not by the age of the boards.
What each scope replaces, and the Boise permit question
ScopeWhat is replacedWhat staysBoise permit questionOur example
Re-deck (resurface)Deck boards, and usually the railing and fasciaJoists, beam, posts, footings and ledger — only if they pass inspection from belowThe brochure does not address re-decking an existing deck — confirm with Boise PDS, (208) 608-7070None among our published projects
Re-frame on existing postsBoards, railing, joists, beam, ledger and its flashingPosts and footings that are still structurally soundNot addressed for existing decks — confirm the permit scope with Boise PDS before work startsLochsa Falls, Meridian
Full tear-outEverything, down to new footingsNothing — size, layout and height can all changeA deck more than 12 inches above grade requires a building permitBoise TimberTech deck; Eagle, Banbury Meadows

The permit column is Boise's rule. Meridian, Eagle and the other Treasure Valley cities and Ada County set their own thresholds, so the Meridian and Eagle examples above fall under their own cities' rules, not Boise's. Our deck permit guide has the city-by-city reference.

What we found under real Treasure Valley decks

All three deck records in our project library are replacements of an existing deck. Each one was decided by a different part of the old structure.

Boise: a painted wood deck with a built-in bench

The original deck was painted wood with a built-in bench and backrest along one side and wood steps down to the yard. Painted wood in Boise's climate — hot, dry summers with strong sun and freeze-thaw winters — needs regular scraping and repainting to stay presentable. Re-covering the old structure with new boards would have tied a new low-maintenance surface to an old frame, so the decision was to replace the entire deck, structure included.

We demolished and hauled away the deck, the bench and the steps, then rebuilt from the footings up: six new concrete footings, 4×4 pressure-treated posts on galvanized post-base brackets, and a new 2×8 pressure-treated frame — a 16-foot rim board and fifteen joists set with joist hangers and structural connectors. TimberTech AZEK decking went on with a hidden-fastener system, the rim was wrapped in matching fascia, and two step runs and 30 linear feet of 36-inch black metal railing replaced the old bench. See the full before and after.

Old deck boards removed exposing the original deck frame at a Boise home
June 17, 2026: old decking stripped to the frame.
New pressure-treated 2x8 deck frame on post bases and concrete footings in Boise
June 19, 2026: new 2×8 frame on new footings.

Meridian: ledger rot where the flashing had failed

At Lochsa Falls the second-story deck was original to the home's 2005 build. The pressure-treated ledger board showed rot where flashing had failed, several joists had visible decay at the beam connections, the wood decking was splintered and cupping, and the railing spindles were loose and did not meet current code spacing.

The posts were still structurally sound, so this became a re-frame rather than a full tear-out: a complete tear-off down to the posts, new hot-dipped galvanized post brackets, a new pressure-treated beam and 2×10 joists with Simpson Strong-Tie connectors, and a new ledger with integrated flashing bolted to the house. The 350 sq ft deck sits 10 feet up, so it also got TimberTech AZEK decking, a DrySpace under-deck drainage system to keep the patio below dry, and a 16-step staircase to the yard. Read the Meridian project.

Eagle: a small, rotting pressure-treated deck

In Banbury Meadows the homeowners had a small, rotting pressure-treated deck that was too small for the family and unsafe for their grandchildren, on a yard with a 2-foot grade change. The replacement was an entirely new structure: concrete footings (24-inch diameter, below the frost line), a pressure-treated substructure framed for two levels, Trex Transcend composite decking, a step-down lounge level that works with the grade, and a 12×12 attached pergola. The new deck is 500 sq ft. Read the Eagle project.

What deck replacement costs

Scope drives price more than square footage does. The more of the old structure that can stay, the less of the job is demolition, footings, posts and framing.

Resurfacing saves the substructure demolition, footings, posts and framing — which together are a large share of a deck's cost. That saving disappears quickly once ledger replacement, joist work and post remediation stack up, which is the point at which a re-frame or a full tear-out becomes the better value. Height, footings and perimeter matter more than area: an elevated deck needs longer posts, bracing and, in Boise above six feet, stamped engineering.

For price ranges by size and material, see our deck building cost guide. For why a single per-square-foot number misleads, see deck cost per square foot in Boise. Your estimate is written to the scope we find under your boards.

Permits for deck replacement and repair in Boise

Boise's published rule is about height, and it is short. In the City's own words: “A building permit is required when a deck or concrete patio is more than 12 inches above grade.”

That sentence comes from the City of Boise residential construction brochure (updated 5/2023). It settles a full tear-out and rebuild: a new deck more than 12 inches above grade needs a building permit. It does not say how the rule applies to work on an existing deck — replacing only the boards, sistering or replacing joists, or replacing a railing — and none of the other City sources we cite address it either.

Until we have a dated answer from the City on record, our guidance for those jobs is to confirm with Boise Planning & Development Services at (208) 608-7070 before work starts. For setbacks the brochure points to the Planning Department at (208) 608-7100. When Iron Crest takes on the job, we confirm the permit requirements during planning and pull customary permits as part of the contract.

What a Boise deck submittal has to show (checklist #406)Official source· City of Boise
DrawingWhat it must include
Site planExisting structures and the proposed deck, with dimensions and distances to property lines and other buildings
Framing planLocations of all footings and posts; type, size, spacing, span and direction of all joists; beams and connectors
ElevationsEach side of the deck with its height and how it attaches to the house; guardrail height and member spacing if the deck is over 30 inches above grade
Section viewsFooting size and depth, post-to-footing, beam-to-post and joist-to-beam and ledger connections, connection to the house, guardrail and mechanical connectors
Structural calculationsStamped by an Idaho licensed engineer for a deck taller than six feet above grade, or for designs or materials not addressed in the IRC

The full Boise process — plan review, the footing and framing inspections, fees and the Treasure Valley city-by-city thresholds — is on our Boise deck permits page.

Process and timeline

Every replacement follows the same order. What changes is how many of the steps the old structure lets us skip.
  1. Assessment from below. We remove boards and inspect the ledger and its flashing, the joists and beam, the post bases and the footings. This sets the scope.
  2. Scope, design and permit. The drawings a Boise submittal needs (above) are prepared and submitted; other cities have their own requirements.
  3. Demolition and haul-away. The old decking, railing, steps and any built-ins come out — down to the frame, the posts or the ground, depending on scope.
  4. Footings and posts. New footings go below the 24-inch frost depth; posts sit in galvanized post bases that keep the end grain off the concrete. Sound existing posts and footings stay on a re-frame.
  5. Frame and ledger. New beam, joists, hangers and connectors, and a properly flashed ledger on an attached deck. On a permitted deck the framing is inspected before any decking goes on.
  6. Surface, stairs and railing. Decking, fascia, steps and guards — guards are required once the deck is more than 30 inches above grade.
  7. Final inspection and walkthrough.
How long our recent replacements tookIron Crest canonical pricing· project records
ProjectScopeDuration on record
Boise, 160 sq ftFull tear-out from new footings; two step runsJob photos June 17 to June 21, 2026; contract schedule 4–6 working days
Meridian, 350 sq ft, 10 ft highRe-frame on existing posts; drainage and 16-step stair4 weeks in total, including 2 weeks of assessment, design and permit application; demolition 2 days, structural rebuild 3 days
Eagle, 500 sq ftFull replacement, two levels, attached pergola3 weeks in total, including 1.5 weeks of design, engineering and permit application; footings and framing 4 days

Larger, elevated or attached decks take longer, and permit review time comes on top of construction. For a phase-by-phase view of a new build, see the deck building timeline.

New TimberTech AZEK composite deck with black metal railing and steps in a Boise backyard
June 21, 2026: the finished Boise replacement — new footings, frame, surface and railing.

Deck replacement — common questions

Do I need a permit to replace deck boards in Boise?

The City of Boise's residential construction brochure (updated 5/2023) says a building permit is required when a deck is more than 12 inches above grade. It does not say how that applies to replacing only the boards on an existing deck, so confirm with Boise Planning & Development Services at (208) 608-7070 before work starts. Keep in mind that a re-decking job often changes scope once the old boards come off and the frame underneath can be inspected. Iron Crest confirms permit requirements for every deck during planning.

Do I need a permit to replace deck joists or a deck railing in Boise?

Confirm with Boise PDS at (208) 608-7070. The City's brochure sets the deck trigger by height (more than 12 inches above grade) and does not address joist or railing replacement on an existing deck. What is published is what a Boise deck submittal has to show: a framing plan with the type, size, spacing, span and direction of every joist, and — for a deck more than 30 inches above grade — the guardrail height and member spacing (Boise submittal checklist #406). Guards are required at that height under IRC R312.1.1.

Should I replace my deck or just resurface it?

Resurface when the framing, posts, footings and ledger are structurally serviceable and the joist spacing suits the new decking. Replace when there is structural deterioration, an unsound ledger connection, framing that does not suit the decking you want, or when the size, layout or height needs to change. The decision cannot be made from the deck surface — the ledger, the post bases and the fasteners decide it, and they are hidden. Our deck replacement vs resurfacing guide walks through the inspection.

How long does a deck replacement take?

On our recent jobs: a 160 sq ft Boise deck replaced from new footings up ran from stripped decking on June 17, 2026 to a finished deck on June 21, against a contract schedule of 4–6 working days. A 350 sq ft, 10-foot-high deck in Meridian took 4 weeks in total, including 2 weeks of structural assessment, design and permit application. A 500 sq ft multi-level deck with a pergola in Eagle took 3 weeks. Larger, elevated or attached decks take longer, and permit review time comes on top of construction.

Sources & technical references

Each reference below is cited for a specific claim on this page. Codes, fees and product specifications change — confirm current requirements with the authority having jurisdiction before relying on them for a project decision.

Ready to replace your deck?

We inspect the frame first, then build the replacement it actually needs — across Boise and the Treasure Valley.