Skip to main content

Interior Renovations Bundle Services

When you need more than one room updated, bundling your interior projects saves time, money, and hassle. Iron Crest Remodel coordinates all trades under one project manager with one timeline and one point of contact.

Interior Renovations Bundle

What We Deliver

  • Kitchen + bathroom remodel bundles
  • Whole-house flooring + painting packages
  • Multi-bathroom renovation bundles
  • Kitchen + flooring + painting combos
  • Single project manager for all work
  • Coordinated material purchasing (bulk savings)
  • Phased scheduling to minimize disruption
  • 10-20% savings vs. separate projects

Typical Investment

10–20% savings vs. separate

View cost guides →

Timeline

Varies by scope

Our Process

1

Bundle Consultation

We assess all rooms and areas you want to renovate, discuss priorities, and develop a comprehensive scope that maximizes your savings.

2

Unified Design & Budget

One cohesive design plan across all spaces. Materials are coordinated for consistency and bulk pricing. You approve one budget for the entire bundle.

3

Phased Construction

Work proceeds in a logical sequence — typically rough work across all spaces first, then finishes. One crew moves through the home efficiently.

4

Single Final Walkthrough

All bundled work is inspected together. One punch list, one completion date, one warranty package.

Frequently Asked Questions

How much do I save by bundling interior projects?

Bundling typically saves 10-20% compared to doing the same projects separately. Savings come from reduced mobilization costs, bulk material pricing, and efficient trade scheduling.

What interior projects can I bundle?

Any combination of our interior services — kitchen, bathroom, flooring, painting, tile, basement, and whole-home remodeling. The more you bundle, the more you save.

How long does a bundled interior renovation take?

Bundled projects are typically 20-30% faster than doing the same work as separate projects because trades are scheduled back-to-back without gaps. A kitchen + 2 bathrooms + whole-house paint might take 10-14 weeks bundled vs. 16-20 weeks separately.

Related Resources

Plan your interior renovations bundle project with our in-depth guides.

Ready to Start Your Remodeling Project?

Get a free, no-obligation estimate from Boise's trusted remodeling experts. Licensed, insured, and ready to build.

Why Bundle Interior Projects Together

Boise kitchen and flooring renovation in progress showing cabinet installation alongside new luxury vinyl plank flooring

Most Boise homeowners know they need to update their kitchen, bathrooms, and flooring — but they assume each project has to happen separately, months or even years apart. That approach costs more, takes longer, and forces your household through multiple rounds of construction disruption. Bundling interior renovations into a single managed project eliminates those inefficiencies and delivers a better result for less money and less stress.

  • Save 10–20% vs. separate projects — shared mobilization, dumpster rental, material orders, and permit fees eliminate redundant costs that add up fast when you hire different crews at different times
  • Single timeline instead of disrupting your home multiple times — one construction phase means one adjustment period, one set of dust barriers, and one final cleanup instead of repeating the process for every room
  • Coordinated design across rooms for a cohesive look — your designer selects flooring, cabinet hardware, paint colors, tile, and fixtures together so every room flows naturally into the next
  • One project manager, one contract, one warranty — a single point of accountability from start to finish, with one comprehensive warranty covering all work instead of chasing multiple contractors for separate issues
  • Reduced total project duration through parallel work crews — electricians wire the kitchen while tile setters work in the bathroom, compressing months of sequential work into weeks of coordinated progress
  • Less wear on your home from multiple construction phases — every construction project means foot traffic, material staging, and dumpster placement that stresses your landscaping, driveway, and common areas; doing it once reduces that impact significantly
  • Better material pricing from bulk orders — ordering flooring for the whole house, fixtures for multiple bathrooms, and paint for every room in a single purchase gives us volume pricing that individual room-by-room projects cannot match

Popular Interior Bundle Packages

Every bundled project is custom-scoped to your home, but these are the four interior renovation packages Boise homeowners request most often. Each bundle is designed to maximize cost savings by grouping trades that naturally overlap — plumbing with plumbing, flooring with flooring, finishing with finishing.

Completed bundled kitchen and living room renovation in Boise showing seamless flow between new navy cabinets and hardwood floors

Kitchen + Flooring Bundle

Our most popular interior bundle — and for good reason. Kitchen remodels already require removing the existing kitchen floor, so extending new flooring into adjacent living areas, hallways, and dining rooms while the crew and materials are on-site adds minimal labor cost. We install LVP, hardwood, or tile throughout the connected spaces during the kitchen demo phase, then build the new kitchen on top of the finished floor for a seamless look with no awkward transitions. This bundle also ensures your new kitchen flooring matches the rest of your main level perfectly. Typical Boise range: $30,000–$70,000 depending on kitchen scope and total flooring square footage.

Kitchen + Bathroom Bundle

Combining kitchen and bathroom remodels creates significant savings on plumbing and electrical work because the same licensed tradespeople handle rough-in and finish for both spaces in a single mobilization. Your plumber runs supply lines and drains for the kitchen sink, dishwasher, and pot-filler while also roughing in the new bathroom shower valve, vanity supply, and toilet flange — one trip, one permit, one inspection cycle. We also coordinate the finish palette across both rooms so hardware, faucet styles, and color tones feel intentionally connected rather than mismatched. Typical Boise range: $40,000–$90,000 depending on kitchen complexity and bathroom count.

Whole-Interior Bundle

The comprehensive package: kitchen remodel, one or more bathroom remodels, whole-house flooring, and interior paint. This is the bundle that delivers the largest percentage savings because nearly every trade — demolition, framing, plumbing, electrical, drywall, tile, flooring, painting, and trim carpentry — is shared across multiple rooms. We phase the work strategically so you always have a functional bathroom and a temporary cooking area, and we typically complete the entire interior transformation in 12–18 weeks rather than the 6–12 months it would take to schedule each project separately. Typical Boise range: $60,000–$150,000+ depending on home size, room count, and finish level.

Bathroom + Flooring Bundle

An efficient bundle for smaller homes, condos, or homeowners who recently updated their kitchen but still need bathroom and flooring upgrades. We demo the bathroom and adjacent hallway flooring simultaneously, install new subfloor and waterproofing in the bathroom while laying LVP or hardwood in the main living areas, then tile the bathroom floor and shower in the same week the flooring crew finishes the rest of the house. This bundle is especially popular in Boise's North End and Bench-area homes built in the 1950s–1970s where original bathrooms and carpet need updating together. Typical Boise range: $15,000–$40,000 depending on bathroom scope and flooring square footage.

Bundle Savings Breakdown

The savings from bundling interior renovations come from eliminating redundant costs that are baked into every standalone project: mobilization, dumpster fees, permit applications, material delivery charges, and the overhead of scheduling and managing each project independently. Here is a realistic comparison based on our 2025–2026 Boise project data.

Project ScopeIndividual CostBundled CostTypical Savings
Kitchen + Flooring (1,200 sq ft)$55,000–$75,000$47,000–$64,00012–18%
Kitchen + 1 Bathroom$60,000–$85,000$51,000–$73,00014–18%
Kitchen + 2 Bathrooms$80,000–$115,000$66,000–$96,00016–20%
Kitchen + Bath + Flooring + Paint$90,000–$140,000$72,000–$115,00018–22%
2 Bathrooms + Flooring$40,000–$60,000$34,000–$50,00012–17%
Bathroom + Flooring (small home)$22,000–$38,000$18,000–$32,00010–16%

Where the savings come from: A single dumpster rental ($450–$600) replaces two or three separate rentals. One building permit ($800–$1,500) covers all scopes instead of filing individually. Material deliveries are consolidated into fewer drops, reducing delivery fees and job-site staging time. Your project manager coordinates all trades in a single schedule rather than managing separate timelines weeks or months apart. And bulk material orders — flooring, paint, grout, underlayment, trim — qualify for contractor volume pricing that is not available on single-room quantities.

Boise Interior Bundle Considerations

Bundling multiple interior projects introduces logistics that a single-room remodel does not. Here is how we handle the most common concerns Boise homeowners raise when considering a whole-interior renovation.

Professional dust containment with zipwall barrier and HEPA air scrubber separating kitchen demolition from living area

Living at Home During Construction

Most of our bundled-project clients stay in their homes throughout the renovation. We design a phasing plan before demolition begins that guarantees access to at least one functional bathroom and a temporary kitchen setup at all times. In a typical kitchen-first sequence, we complete the kitchen in 6–8 weeks, reconnect appliances, and then shift crews to the bathrooms and flooring areas. For whole-interior bundles, we set up a temporary kitchen station (microwave, mini-fridge, portable countertop, coffee maker) in a bedroom or garage so you can prepare basic meals while the main kitchen is offline. Dust containment is critical — we install zipwall barriers with negative-air HEPA filtration between work zones and living spaces, and we vacuum and wipe down common areas at the end of every work day.

Phased vs. All-at-Once Approach

For most Boise homes, a phased approach delivers the best balance of livability and efficiency. We demo and rebuild one major space at a time — usually kitchen first, then bathrooms, then flooring and paint — while overlapping trades wherever possible. The alternative is an all-at-once approach where we strip the entire interior to studs and rebuild everything simultaneously. This is faster (8–12 weeks vs. 14–18 weeks for phased) but requires you to move out of the home entirely. We recommend the all-at-once approach only for investment properties, pre-move-in renovations, or homeowners who have a convenient temporary living arrangement. Your project manager will help you evaluate which approach makes sense for your situation.

Dust, Noise, and Daily Life Management

Construction generates dust, noise, and foot traffic — and a bundled project means those impacts last longer than a single-room remodel. We mitigate this with HEPA-filtered negative air machines in every active work zone, floor protection runners in all hallways and living areas, and strict work-hour windows (typically 7:30 AM–5:00 PM Monday through Friday, with Saturday work by arrangement only). Demolition and tile cutting — the loudest operations — are scheduled in concentrated blocks rather than spread across the entire project. We also provide weekly schedule updates every Friday so you know exactly which rooms will be active the following week and can plan accordingly.

Boise-Specific Timing and Scheduling

Interior bundles can start any time of year since the work is inside your home, but Boise's construction calendar does affect scheduling. Spring and summer are peak season for exterior and new-construction projects, which means trade availability for interior work is tighter from May through September. Booking a bundled interior renovation for late fall or winter (October through February) often means faster scheduling, better trade availability, and more flexibility on start dates. Material lead times also matter — custom cabinetry currently runs 6–8 weeks from order to delivery, and popular countertop slabs can take 3–4 weeks. We recommend starting the design and selection process at least 8–10 weeks before your preferred construction start date.

Design Coordination & Material Selection

Interior design consultation with material samples including cabinet doors, countertop stones, tiles, and paint swatches spread across a table

One of the biggest advantages of bundling is that your designer coordinates finishes across every room at once. When kitchen cabinets, bathroom tile, flooring, and paint colors are selected together, you get a cohesive look throughout your home instead of rooms that feel disconnected because they were designed months or years apart.

Our design process starts 8–10 weeks before construction begins. During a comprehensive design session at our Boise showroom, we walk through each room in your bundle and make selections for cabinetry, countertops, tile, flooring, fixtures, hardware, and paint. Everything is organized into a digital selections binder that your project manager, trade crews, and suppliers all reference throughout the project.

Kitchen Selections

  • Cabinet style, wood species, and finish color
  • Countertop material and edge profile
  • Backsplash tile pattern and grout color
  • Sink, faucet, and hardware finish (brushed nickel, matte black, etc.)
  • Appliance package and panel specifications
  • Under-cabinet and pendant lighting

Bathroom Selections

  • Vanity style and countertop material
  • Shower tile (wall and floor) with accent pattern
  • Shower fixtures and valve trim
  • Mirror, lighting, and hardware to match kitchen finish
  • Toilet model and seat style
  • Towel bars and accessories

Flooring Selections

  • Material type: LVP, hardwood, engineered wood, or tile
  • Color and plank width/pattern
  • Transition strips between rooms and flooring types
  • Underlayment specification for sound and moisture
  • Stair nosing and closet flooring details
  • Baseboard and shoe molding style

Paint & Trim Selections

  • Wall colors for each room (typically 2-3 coordinating tones)
  • Trim, door, and ceiling paint color and sheen
  • Accent wall treatments (if applicable)
  • Cabinet paint or stain color (if painting existing cabinets)
  • Primer and preparation specifications
  • Touch-up paint quantities for future maintenance

Lead time tip: Custom cabinetry currently runs 6–8 weeks from order to delivery, and popular quartz and granite slabs can take 3–4 weeks for fabrication. Special-order tile from European manufacturers may require 4–6 weeks. We build these lead times into your project schedule so materials arrive on-site exactly when crews need them — no delays, no storage fees.

Our Bundled Interior Renovation Process

Every bundled interior project follows a structured 7-step process designed to minimize disruption, control costs, and deliver a predictable timeline. Here is exactly what to expect from first call to final walkthrough.

1

Discovery & Scope Definition

We visit your home, walk every room included in the bundle, document existing conditions (measurements, structural notes, mechanical locations), and discuss your goals, budget range, and timeline preferences. This visit typically takes 60–90 minutes and results in a preliminary scope document outlining which rooms, which trades, and which finish levels are included.

2

Design Session & Material Selections

At our Boise showroom or your home, we finalize all material selections room by room. Your designer coordinates the palette across spaces so cabinets, countertops, tile, flooring, fixtures, and paint all work together. You receive a digital selections binder with photos, SKUs, and specifications for every item — this becomes the single source of truth for the entire project.

3

Detailed Proposal & Contract

We deliver a fixed-price proposal with a line-item breakdown for each room and trade. The proposal includes a phasing schedule showing which rooms are active each week, a payment milestone schedule tied to completed work (not calendar dates), and our warranty terms. No hidden fees, no allowance surprises — your number is your number.

4

Pre-Construction & Material Ordering

Once signed, we order all long-lead materials immediately (cabinets, countertops, special-order tile) and submit permit applications to the City of Boise. We schedule a pre-construction meeting at your home with the project manager and lead carpenter to review the phasing plan, dust containment setup, temporary kitchen station location, and daily access protocols.

5

Demolition & Rough-In Phase

Demolition starts in the first room of the phasing sequence (typically the kitchen). We install dust containment barriers the morning of demo day before any work begins. During demo week, plumbing and electrical rough-in begins in the first room while demo continues in subsequent rooms. Inspections are scheduled in batches so we don’t wait for individual room sign-offs.

6

Build & Finish Phase

This is the longest phase, where cabinets are installed, countertops are templated and fabricated, tile is set, flooring is laid, and painting begins. Crews move through rooms in sequence based on the phasing plan. Your project manager provides weekly photo updates every Friday showing progress in each active room. Change orders, if any, are documented and approved in writing before work proceeds.

7

Final Walkthrough & Warranty Activation

After all work is complete, your project manager conducts a detailed walkthrough with you in every room, checking every detail against the selections binder and scope document. We create a punch list for any items that need correction, complete those within 3–5 business days, and then schedule a final sign-off. Your comprehensive warranty activates on the sign-off date.

Warranty & Post-Project Support

A bundled renovation is a significant investment, and our warranty reflects that. Every Iron Crest bundled interior project is backed by a single comprehensive warranty covering all trades and all rooms — not the patchwork of separate warranties you get from hiring multiple contractors.

Workmanship Warranty

5 Years

Covers all labor and installation defects across every room in your bundle. If a cabinet door warps, tile cracks, or trim separates due to installation error, we repair or replace it at no cost.

Material Warranty

Manufacturer Terms

All materials carry their full manufacturer warranty. We register warranties on your behalf and retain copies in your project file. Cabinetry (lifetime to 25 years), countertops (10–15 years), flooring (20–25 years).

Structural Warranty

10 Years

Any structural modifications (wall removals, beam additions, floor reinforcement) are warranted against structural failure for 10 years. Engineered by a licensed Idaho PE.

30-day punch list guarantee: If you notice any detail that does not meet the agreed scope and finish quality within 30 days of your final walkthrough, contact your project manager directly and we will address it within 3–5 business days at no additional charge. We also schedule a complimentary 6-month follow-up visit to inspect caulk lines, grout joints, paint touch-ups, and hardware tightness — catching minor settling issues before they become problems.

More Interior Bundle Questions

How much do I save by bundling interior renovation projects in Boise?

Most Boise homeowners save 10–20% compared to hiring separate contractors or scheduling individual projects at different times. The savings come from shared mobilization costs (one dumpster rental, one permit cycle, one material delivery), bulk material pricing, and reduced overhead because your project manager, site supervisor, and trade crews are already on-site. For example, a kitchen remodel at $45,000 plus a bathroom remodel at $25,000 would total $70,000 individually — but bundled together with Iron Crest, the same scope typically comes in at $59,000–$63,000 because we eliminate redundant setup, tear-down, and scheduling gaps between projects.

Can I live at home during a bundled interior renovation?

Yes, and most of our Boise clients do. We design a phasing plan that keeps at least one functional bathroom and a temporary kitchen setup (microwave, mini-fridge, coffee maker) available throughout the project. For whole-interior bundles that include the kitchen, we typically complete the kitchen first so you regain cooking access while we move to bathrooms and flooring. Dust containment barriers, negative-air machines, and daily cleanup keep the livable areas of your home comfortable. We also schedule the loudest and most disruptive work — demolition, tile cutting, floor sanding — during weekday business hours so evenings and weekends are quieter.

How long does a bundled interior renovation take compared to separate projects?

A bundled project is significantly faster than doing each project individually because we overlap trades and eliminate the gaps between separate projects. A kitchen remodel alone takes 6–8 weeks and a bathroom remodel takes 3–5 weeks — done separately, that is 9–13 weeks of total disruption plus the scheduling gap between them (often 4–8 weeks while you wait for contractor availability). Bundled together, we complete both in 8–11 weeks total because plumbing, electrical, and finishing crews move directly from one space to the next without downtime. Whole-interior bundles (kitchen + bathrooms + flooring + paint) typically take 12–18 weeks depending on scope.

Do I need to choose all my finishes and materials before a bundled project starts?

We require final selections for any materials with long lead times — cabinetry (6–8 weeks), countertops (3–4 weeks), and special-order tile (2–4 weeks) — before we begin demolition. However, one of the biggest advantages of bundling is that your designer can coordinate finishes across all rooms at once, ensuring your flooring, cabinet hardware, paint colors, and fixture finishes create a cohesive look throughout your home. We schedule a comprehensive design session before the project starts where we lock in all selections room by room, which actually simplifies the decision process compared to making isolated choices for separate projects months apart.

Ready to Start Your Remodeling Project?

Get a free, no-obligation estimate from Boise's trusted remodeling experts. Licensed, insured, and ready to build.

Call NowFree Estimate
Interior Renovation Packages Boise | Save 10-20%