Skip to main content
Iron Crest Remodel — Home
Basement Finishing in Boise Bench

Basement Finishing in Boise Bench

Boise Bench, Boise 7 weeks 900 sq ft

Quick answer

Iron Crest Remodeling Group LLC completed this basement remodeling project in Boise Bench, Boise: square footage 900 sq ft, budget range $55,000–$68,000. A 900 sq ft unfinished basement converted into a family room, guest bedroom with egress window, full bathroom, and home office — doubling the home's usable living space.

Project Overview

A 900 sq ft unfinished basement converted into a family room, guest bedroom with egress window, full bathroom, and home office — doubling the home's usable living space.

Project Details

Project Duration
7 weeks
Square Footage
900 sq ft
Budget Range
$55,000–$68,000
Rooms Created
4 rooms
Ceiling Height
7 ft 6 in
Bathroom
Full bath w/ shower
Get a Free Estimate

The Challenge

The unfinished basement was used only for storage and laundry. With the family growing, the homeowners needed a guest bedroom, a dedicated home office, and a family room for the kids — without the cost and disruption of building an addition. The basement had low ceiling height (7'6"), required an egress window for the bedroom, and needed full HVAC extension.

Our Solution

We designed a layout that maximized every square foot within the existing footprint. An egress window well was excavated and installed for the bedroom to meet code. A full bathroom with shower was plumbed from existing basement drain lines. The HVAC system was extended with new supply and return ducts. Recessed LED lighting was used throughout to preserve ceiling height. Sound insulation was installed in the ceiling between the basement and main floor.

The Result

The family gained four new functional rooms in the same footprint — effectively doubling their usable space. The guest bedroom with full bath is used regularly for visiting family, the home office provides a quiet workspace, and the family room has become the kids' primary hangout area. The project added significant value to the home.

Before & After

Drag the slider to compare the transformation of this basement remodeling project in Boise Bench, Boise.

Before: original condition before basement remodeling

Before

After: completed basement remodeling

After

Project Photos

Completed whole-home remodeling in Boise

The completed project

Original condition before the whole-home remodeling in Boise

Before: the original condition

Project Timeline

1

Design & Permits

2 weeks

Layout design, egress window planning, HVAC extension design, electrical plan, permits

2

Egress Window

3 days

Exterior excavation, foundation cut, egress window well and window installation

3

Framing & HVAC

1.5 weeks

Wall framing, HVAC duct extension, bathroom plumbing rough-in

4

Electrical & Insulation

1 week

Electrical rough-in, recessed light layout, sound insulation in ceiling, wall insulation

5

Drywall & Finish

1.5 weeks

Drywall hang, tape, mud, prime, paint, trim installation

6

Flooring, Bath & Final

1 week

LVP flooring, bathroom tile and fixtures, final electrical, punch list

Key Features

900 sq ft of new usable living space
Code-compliant bedroom with egress window
Full bathroom with tile shower
Dedicated home office
Family room / recreation area
Full HVAC extension (heating and cooling)
Sound insulation between floors
Waterproof flooring throughout

Materials Used

Steel framing for exterior walls (moisture resistance)
Wood framing for interior partition walls
Rockwool insulation (walls and ceiling sound barrier)
Luxury vinyl plank flooring (waterproof)
Porcelain tile for bathroom floor and shower
Egress window with well system (code-compliant)
LED recessed lighting (6" slim profile for low ceilings)
LVP-compatible baseboards and modern trim

Planning a basement remodeling project?

Get a free, no-obligation estimate for your project in Boise or anywhere in the Treasure Valley.