
From outdated layouts to modern, efficient spaces — we handle design, demolition, plumbing, tile, fixtures, and every detail in between.
Transform your bathroom with a remodeling plan built around function, comfort, and long-term value.

A bathroom remodel can range from a simple fixture and finish update to a complete gut renovation involving new plumbing lines, electrical circuits, waterproofing, tile work, and custom vanity installation. The scope depends on what you want to change — layout, fixtures, storage, accessibility, or all of the above. In the Treasure Valley, bathrooms built before 2000 often have galvanized plumbing, inadequate ventilation, and small footprints that no longer match how families use the space. A well-planned bathroom remodel addresses all of these issues while upgrading to modern materials, efficient fixtures, and a layout that works for daily life. Whether you are converting a tub to a walk-in shower, expanding a cramped primary bath, or fully renovating a hall bathroom, the key is planning every element — plumbing rough-in, waterproofing, tile layout, vanity selection, lighting, ventilation, and finish hardware — before demolition begins.
Star homeowners pursue bathroom remodeling for a variety of reasons. Here are the most common situations we see:
Not every bathroom remodel project is the same. Here are the most common project types we complete in Star:

Full renovation of the main bathroom including layout changes, double vanity installation, walk-in shower or freestanding tub, new tile, lighting, and ventilation upgrades. This is the most common high-value bathroom project.

Update a secondary bathroom with new fixtures, tile, vanity, and finishes. These projects focus on function and visual refresh without major layout changes.

Remove an existing bathtub and replace it with a walk-in shower, including new drain placement, waterproofing, tile or panel walls, glass enclosure, and updated fixtures.

Design and build a barrier-free bathroom with zero-threshold shower entry, grab bars, bench seating, anti-slip flooring, and wider doorways for wheelchair or mobility aid access.

Refresh a small half-bath with a new vanity, faucet, lighting, mirror, paint, and accent tile or wallcovering. A high-impact upgrade for a modest budget.

Star's housing stock is overwhelmingly post-2015 construction. Modern systems throughout, but builder-grade finishes that homeowners customize over time.
A small number of older homes in the original townsite. These may need system and finish updates.
New construction with modern systems, open floor plans, and builder-grade finishes. Most remodeling focuses on finish upgrades and outdoor living additions.

Material selection affects the look, durability, and cost of your bathroom remodel. Here are the most popular options we install in Star:

The most popular choice for bathroom floors and shower walls. Porcelain is dense, water-resistant, available in hundreds of styles including wood-look and stone-look patterns, and extremely durable in wet environments. Large-format porcelain tiles (12x24 and larger) create a modern, seamless look with fewer grout lines.
Best for: Shower walls, floors, accent features, and niches

A versatile and budget-friendly tile option for bathroom floors and backsplash areas. Ceramic is slightly softer than porcelain and available in a wide range of sizes, colors, and patterns. It works well for walls and dry-area floors.
Best for: Budget-conscious floor and wall applications

Natural stone delivers a premium, one-of-a-kind look. Marble is the classic choice for luxury bathrooms, travertine offers warmth and texture, and slate provides a rugged, natural feel. All natural stone requires sealing and ongoing maintenance.
Best for: Feature walls, shower surrounds, vanity tops, and floor accents

Engineered quartz is the top choice for bathroom vanity countertops. It is non-porous, stain-resistant, available in a wide range of colors and patterns, and does not require sealing. Quartz resists water spots and soap buildup better than natural stone.
Best for: Vanity countertops, shelving surfaces

For homeowners who want a grout-free, low-maintenance shower, solid surface panels provide a smooth, seamless wall system. Available in stone-look patterns, these panels install faster than tile and require minimal upkeep.
Best for: Low-maintenance showers, accessible bathrooms, budget-friendly updates

Here is how a typical bathroom remodel project works from first contact to final walkthrough:
We visit your home, measure the existing bathroom, discuss what is and is not working, review your goals and budget range, and photograph the space. You will receive a preliminary scope outline within a few days that includes layout options, material direction, and a ballpark estimate range.
We create a detailed design plan including tile layouts, vanity specifications, fixture selections, lighting placement, and color palette. You select materials from our supplier partners or bring your own. We finalize the scope of work, confirm lead times, and prepare a fixed-price contract.
If your project involves plumbing relocation, electrical changes, or structural modifications, we pull the required permits through your local jurisdiction. We also coordinate scheduling with our tile installer, plumber, electrician, and glass supplier so every trade is lined up before demolition day.
We protect adjacent rooms with dust barriers and floor coverings, then carefully demolish the existing bathroom down to studs and subfloor as needed. Plumbing and electrical rough-in happens next — this is when drain locations, water supply lines, recessed lighting, exhaust fan ducting, and any structural framing changes are completed.
Every shower and wet area receives a proper waterproofing membrane system — either sheet membrane, liquid-applied membrane, or a foam panel system like Kerdi or GoBoard. We verify proper slope to drain, inspect the substrate for flatness and stability, and prepare all surfaces for tile.
Tile installation begins with floor tile, then shower walls and niches, then any accent features. The vanity is set and plumbed, the mirror and lighting are installed, and all fixtures — faucets, showerhead, toilet, towel bars, and hardware — are connected and tested.
We complete a detailed punch list inspection, verify all plumbing and electrical connections, test every fixture, and confirm caulk lines, grout joints, and finish details are clean. A final walkthrough with you ensures everything meets expectations before we consider the project complete.
Here is what to expect for project duration when planning a bathroom remodel in Star:
| Phase | Duration | Details |
|---|---|---|
| Design and Planning | 2–4 weeks | Initial consultation, measurements, design development, material selections, and contract finalization. Material lead times (tile, vanity, glass) often extend this phase to 4-6 weeks if custom items are involved. |
| Permitting | 1–3 weeks | Permit application, review, and approval through Ada County or Canyon County. Straightforward projects may clear in a few days; projects with structural changes take longer. |
| Demolition and Rough-In | 3–5 days | Remove existing fixtures, tile, drywall, and subfloor as needed. Complete plumbing and electrical rough-in. Schedule and pass rough inspection. |
| Waterproofing and Tile Installation | 5–10 days | Apply waterproofing membranes, install cement board or backer panels, set tile (floor, walls, shower, niches), grout, and seal. This is typically the longest phase of active work. |
| Fixture and Finish Installation | 3–5 days | Install vanity, countertop, sink, faucet, toilet, mirror, lighting, exhaust fan, glass shower door, towel bars, and all finish hardware. |
| Final Inspection and Walkthrough | 1–2 days | Complete punch list, pass final inspection, and conduct walkthrough with homeowner. Ensure all caulk, grout, and finish details are clean. |
Typical range: $12,000 – $55,000+
Most projects: $22,000–$35,000
The final cost of your bathroom remodel in Star depends on several factors. Here are the biggest cost drivers:
Moving plumbing drain locations, relocating fixtures, or expanding the footprint of the bathroom significantly increases cost due to plumbing rough-in, framing, and potential subfloor work.
Tile is often the single largest material cost in a bathroom remodel. Floor-to-ceiling tile in a large shower, intricate mosaic patterns, or premium natural stone can add thousands to the budget compared to standard subway tile.
A stock vanity with a cultured marble top might cost $400-800. A custom or semi-custom vanity with a quartz top, undermount sinks, and soft-close hardware can run $2,000-5,000+.
Builder-grade faucets and showerheads start around $150-300. Mid-range fixtures from brands like Delta, Moen, or Kohler run $400-1,000. Premium or custom fixtures can exceed $2,000.
Older homes may need updated water supply lines, new drain plumbing, GFCI outlet installation, recessed lighting, or exhaust fan upgrades. These hidden costs are common in pre-2000 homes.
Zero-threshold shower entries, blocking for grab bars, bench seating, wider doorways, and comfort-height toilets add cost but are increasingly popular for aging-in-place planning.
Projects involving plumbing or electrical changes typically require permits. Permit costs in Ada County range from $75-300 depending on scope, plus inspection scheduling time.

Solution: We redesign the layout to maximize usable floor space, improve traffic flow, and create logical zones for the shower, vanity, and toilet areas.
Solution: We demolish to studs, inspect and repair any water-damaged framing or subfloor, install proper waterproofing, and rebuild with modern materials.
Solution: We install a properly sized exhaust fan ducted to the exterior, with a timer or humidity-sensing switch, to control moisture and prevent mold growth.
Solution: Strategic lighting placement, lighter tile and paint colors, glass shower enclosures instead of curtains, and large-format tile with minimal grout lines all help a small bathroom feel larger.
Solution: We design barrier-free shower entries, install grab bars with proper blocking, add bench seating, use anti-slip flooring, and ensure doorways accommodate mobility aids.

Star shares the Treasure Valley climate. Open terrain and rural-edge location mean more wind and UV exposure.
Higher wind loads and more UV exposure than sheltered locations. Durable exterior materials are important.
Homes 3-7 years old may show minor settling cracks in drywall — cosmetic and common in new construction on Treasure Valley soils.
The original town center with a mix of older homes and newer infill. Some properties date back several decades and offer full renovation potential.
Common projects in Downtown Star:
Post-2015 master-planned communities with modern homes. Builder-grade finishes are the primary upgrade target.
Common projects in The Lakes at Pristine Springs / Newer Subdivisions:
Permit authority: City of Star Building Department
Here are the design trends we see most often in Star bathroom remodel projects:
Star's rapid growth and desirable small-town character make updated homes highly sought after. Finish upgrades in Star homes provide strong returns in a competitive resale market. The community continues to attract buyers willing to pay a premium for updated, personalized homes.

A typical full bathroom remodel takes 4 to 8 weeks from demolition to completion, depending on scope, material lead times, and inspection scheduling. A straightforward fixture and finish update with no layout changes may take 2 to 3 weeks. Projects involving plumbing relocation, custom tile work, or structural changes take longer.
Yes, most bathroom remodels that involve plumbing changes, electrical work, or structural modifications require permits in Ada County and Canyon County. A simple cosmetic update — paint, fixtures, and accessories — typically does not. We handle the permit application process and coordinate all required inspections.
Tile and labor are typically the largest line items, followed by the vanity/countertop combination and plumbing rough-in. If the project involves moving drain locations or expanding the footprint, plumbing and framing costs increase significantly.
Yes. Keeping plumbing fixtures in their current locations avoids the cost of rerouting drain and supply lines. Many homeowners save 15-25% by refreshing finishes, tile, and fixtures without changing the floor plan.
It depends on your household needs and resale considerations. Walk-in showers are more popular for primary bathrooms and aging-in-place planning. Having at least one bathtub in the home is generally recommended for families with young children and for resale value.
We use industry-standard waterproofing systems — either sheet membrane (like Schluter Kerdi), liquid-applied membrane, or foam panel systems — on all shower floors, walls, curbs, and niches. Proper waterproofing prevents leaks, mold, and structural damage behind tile.
Porcelain tile is the most popular and practical choice for bathroom floors. It is water-resistant, durable, available in many styles, and can mimic the look of wood or stone. We recommend a slight texture or matte finish for slip resistance in wet areas.
Yes. We provide a workmanship warranty covering installation quality and craftsmanship. Manufacturer warranties on fixtures, tile, and materials are separate and vary by product. We provide documentation for all warranty coverage at project completion.
Get a free, no-obligation estimate for bathroom remodeling in Star, ID. We handle design, permits, and every detail of construction.
Get Your Free Estimate