From detached guest houses to garage conversions — we handle zoning research, design, permitting, and full construction of accessory dwelling units.
Build an ADU that adds usable space, flexibility, and long-term property value.

An ADU (Accessory Dwelling Unit) is a self-contained living space on the same lot as an existing home. ADUs have become increasingly popular in the Boise area as housing demand has grown, zoning rules have evolved, and homeowners have recognized the financial and lifestyle benefits of adding a separate living unit to their property. ADU types include detached new construction (a standalone building on the lot), garage conversions (converting an existing garage into living space), attached additions (building a unit that shares a wall with the main home), and basement conversions (converting a finished or unfinished basement into a separate unit with its own entrance). Every ADU project requires careful navigation of local zoning rules, setback requirements, utility connections, parking requirements, and building code compliance. The design must balance livability, code compliance, construction cost, and long-term value. A well-built ADU adds $100,000+ in property value while generating $800-1,500+ per month in rental income in the Boise market.
Star homeowners pursue adu construction for a variety of reasons. Here are the most common situations we see:
Not every adu builder project is the same. Here are the most common project types we complete in Star:

A standalone structure built on your property — typically 400-1,000 square feet with a bedroom, bathroom, kitchen, and living area. This is the most popular ADU type and offers the most design flexibility.

Convert an existing attached or detached garage into a living space. Includes insulation, drywall, flooring, plumbing, electrical, HVAC, kitchen, and bathroom installation within the existing structure.

Build an ADU that shares one or more walls with the main home but has its own entrance, kitchen, bathroom, and living space. Similar to a home addition but designed as an independent unit.

Convert an existing basement into a separate dwelling unit with its own entrance, kitchen, bathroom, and living area. Requires egress windows, fire separation, and independent utility metering in most jurisdictions.

Star's housing stock is overwhelmingly post-2015 construction. Modern systems throughout, but builder-grade finishes that homeowners customize over time.
A small number of older homes in the original townsite. These may need system and finish updates.
New construction with modern systems, open floor plans, and builder-grade finishes. Most remodeling focuses on finish upgrades and outdoor living additions.

Material selection affects the look, durability, and cost of your adu builder. Here are the most popular options we install in Star:

Most detached ADUs in Idaho use a concrete slab-on-grade or stem wall foundation depending on lot conditions, frost depth, and plumbing requirements. Garage conversions may use the existing slab with modifications.
Best for: Detached ADU new construction

2x4 or 2x6 wood framing for walls, with trusses for the roof. ADU framing follows the same building codes as primary residences, including insulation requirements, fire separation, and structural standards.
Best for: All ADU types

The most common heating and cooling solution for ADUs. A ductless mini-split provides efficient heating and cooling with a small exterior compressor and one or two interior wall units. No ductwork required.
Best for: Detached ADUs and garage conversions

ADU kitchens need to be efficient. A compact kitchen typically includes a 24-inch range, apartment-size refrigerator, single-bowl sink, and upper and lower cabinets — all designed to maximize function in a smaller footprint.
Best for: Studio and one-bedroom ADUs

The ADU exterior should complement the main home. Options include matching the existing siding exactly, using a contrasting but compatible material, or using a modern material like board-and-batten or metal panel for a contemporary look.
Best for: Seamless property aesthetic

Here is how a typical adu builder project works from first contact to final walkthrough:
We research your property's zoning designation, lot size, setback requirements, maximum ADU size allowed, parking requirements, and any HOA restrictions. Not every lot qualifies for an ADU, so this step is critical before investing in design.
Based on feasibility findings, we develop a concept design including floor plan, placement on the lot, utility connection points, and exterior style. You receive a preliminary budget range to confirm the project is viable.
Detailed architectural plans are prepared including floor plans, elevations, structural engineering, mechanical systems, and site plan. These plans must meet local building codes and will be submitted for permit review.
We submit plans for permit review, coordinate utility connections (water, sewer, electrical, gas), and manage any required inspections or reviews. ADU permitting can take 4-8 weeks depending on the jurisdiction.
Excavation, grading, utility trenching, and foundation work. For detached ADUs, this typically means a new concrete foundation. Garage conversions may require foundation modifications.
Complete construction including framing, roofing, siding, windows, insulation, drywall, flooring, kitchen, bathroom, HVAC, electrical, plumbing, and all finish work. The ADU is built to the same code standards as a primary residence.
All required inspections are passed, the certificate of occupancy is issued, and the ADU is ready for use. We provide a complete walkthrough and all warranty documentation.
Here is what to expect for project duration when planning a adu builder in Star:
| Phase | Duration | Details |
|---|---|---|
| Zoning Research and Feasibility | 1–2 weeks | Confirm the property qualifies for an ADU under current zoning, identify setback and size constraints, and determine utility connection feasibility. |
| Design and Engineering | 4–8 weeks | Architectural plans, structural engineering, site plan, and mechanical design. ADU designs must meet full building code requirements. |
| Permitting | 4–8 weeks | Plan review, permit issuance, and any required revisions. ADU permitting timelines vary by jurisdiction in the Treasure Valley. |
| Site Work and Foundation | 2–4 weeks | Excavation, utility trenching, foundation pour, and curing. Weather-dependent in Idaho, especially during winter months. |
| Framing, Roofing, and Mechanical | 4–8 weeks | Framing, roof installation, windows, exterior sheathing, electrical, plumbing, HVAC, and insulation. All rough-in inspections are completed. |
| Interior Finish and Final Inspection | 4–6 weeks | Drywall, paint, flooring, kitchen, bathroom, fixtures, and all finish details. Final inspections and certificate of occupancy. |
Typical range: $80,000 – $300,000+
Most projects: $120,000–$200,000
The final cost of your adu builder in Star depends on several factors. Here are the biggest cost drivers:
A detached new-construction ADU costs significantly more than a garage conversion because it requires a new foundation, full framing, roofing, and all-new utility connections. Garage conversions leverage the existing structure.
ADUs range from 300 sq ft studios to 1,000+ sq ft two-bedroom units. Larger units cost more but provide more rental income potential and livability.
Connecting water, sewer, electrical, and gas to the ADU site involves trenching, new service lines, and potentially utility upgrades. Distance from the main house to the ADU affects cost.
Every ADU needs at least a bathroom and kitchen. The finish level — basic vs. mid-range vs. premium — significantly affects the mechanical and finish costs.
Sloped lots, limited access for equipment, rocky soil, or mature trees in the building area can increase site preparation and foundation costs.
ADU permit fees, impact fees, and utility connection fees vary by jurisdiction. Some Boise-area jurisdictions have reduced or waived impact fees for ADUs to encourage construction.

Solution: A detached ADU on your property generates $800-1,500+ monthly rental income while you continue living in your primary home.
Solution: An ADU with a separate entrance provides privacy and independence while keeping family close. Accessibility features can be built in from the start.
Solution: A garage conversion ADU transforms underutilized space into a functional living unit at a lower cost than new construction.
Solution: A detached ADU configured as a studio or office provides the separation remote workers need, with the commute of a backyard walk.
Solution: A well-built ADU adds $100,000+ to property value and generates ongoing rental income — one of the highest-ROI improvements a homeowner can make.

Star shares the Treasure Valley climate. Open terrain and rural-edge location mean more wind and UV exposure.
Higher wind loads and more UV exposure than sheltered locations. Durable exterior materials are important.
Homes 3-7 years old may show minor settling cracks in drywall — cosmetic and common in new construction on Treasure Valley soils.
The original town center with a mix of older homes and newer infill. Some properties date back several decades and offer full renovation potential.
Common projects in Downtown Star:
Post-2015 master-planned communities with modern homes. Builder-grade finishes are the primary upgrade target.
Common projects in The Lakes at Pristine Springs / Newer Subdivisions:
Permit authority: City of Star Building Department
Here are the design trends we see most often in Star adu builder projects:
Star's rapid growth and desirable small-town character make updated homes highly sought after. Finish upgrades in Star homes provide strong returns in a competitive resale market. The community continues to attract buyers willing to pay a premium for updated, personalized homes.

Yes. ADU projects require building permits, plan review, and multiple inspections. In most Boise-area jurisdictions, ADUs also require zoning compliance review to confirm lot size, setbacks, and parking requirements are met. We handle the entire permitting process.
A detached new-construction ADU typically costs $120,000-200,000+ in the Boise area, depending on size, finish level, and site conditions. A garage conversion is typically $80,000-150,000. Costs include design, engineering, permitting, construction, and utility connections.
From start of design to move-in, a typical ADU project takes 6 to 12 months. This includes design (4-8 weeks), permitting (4-8 weeks), and construction (3-5 months). Garage conversions are faster; detached new construction takes longer.
In most Boise-area jurisdictions, yes. ADUs can be rented as long-term rentals. Short-term rental rules (Airbnb, VRBO) vary by city and may have additional restrictions. Check local regulations before planning a short-term rental strategy.
A well-built one-bedroom ADU in the Boise area can generate $800-1,500+ per month in rental income, depending on location, size, finish level, and market conditions. This income can offset or exceed the monthly cost of financing the ADU construction.
Maximum ADU size varies by jurisdiction. In Boise, detached ADUs can be up to 1,000 square feet or 10% of the lot area, whichever is less. Other cities in the Treasure Valley have different size limits. We confirm the specific rules for your property during the feasibility phase.
Owner-occupancy requirements vary by jurisdiction. Some cities require the property owner to live in either the primary home or the ADU. Others have relaxed or eliminated owner-occupancy requirements. We confirm the rules for your specific location.
Yes. A permitted, well-constructed ADU typically adds $100,000-200,000+ to property value in the Boise area — often more than the construction cost. ADUs also make a property more attractive to buyers who value rental income potential or multigenerational living flexibility.
Get a free, no-obligation estimate for adu construction in Star, ID. We handle design, permits, and every detail of construction.
Get Your Free Estimate